Documents relevant to development in Commerce Road.
Date added: | 23/05/2018 |
Filesize: | 1.39 MB |
Date added: | 23/05/2018 |
Filesize: | 834.45 kB |
Date added: | 23/05/2018 |
Filesize: | 6.02 MB |
Date added: | 23/05/2018 |
Filesize: | 345.75 kB |
Date added: | 23/05/2018 |
Filesize: | 292.22 kB |
Date added: | 23/05/2018 |
Filesize: | 211.05 kB |
Date added: | 23/05/2018 |
Filesize: | 232.43 kB |
Date added: | 23/05/2018 |
Filesize: | 787.22 kB |
Date added: | 30/04/2018 |
Filesize: | 52.25 kB |
Date added: | 05/03/2018 |
Filesize: | 1.11 MB |
Date added: | 10/08/2015 |
Filesize: | 70.02 kB |
BCC 741 - Revised statement on Commerce Road Phase 2
Date added: | 14/07/2015 |
Filesize: | 69.26 kB |
BCC 735
Date added: | 02/12/2011 |
Filesize: | 83.14 kB |
BCC 567 - BCC requests files from ISIS for further detailed assessment of recent planning appllication details.
Date added: | 22/11/2011 |
Filesize: | 625.93 kB |
Date added: | 24/02/2011 |
Filesize: | 131.94 kB |
BCC 534 - Letter to Hounslow Council with BCC responses to ISIS Outline Plan for Commerce Road (Brentford Lock West)
Date added: | 25/11/2010 |
Filesize: | 281.74 kB |
Date added: | 22/09/2010 |
Filesize: | 64.74 kB |
Date added: | 16/03/2010 |
Filesize: | 973.87 kB |
Over the past 9 months ISIS has been speaking to local people in Brentford about how to redevelop the Commerce Road waterside area (Brentford Lock West). Following a number of design workshops with local people during September, October and November 2009, the design team have now prepared an ‘Emerging Development Framework’ which is based on the ideas and feedback generated during these local workshops. This leaflet explains the emerging development framework for Brentford Lock West.
Date added: | 08/02/2010 |
Filesize: | 1.87 MB |
Date added: | 20/11/2009 |
Filesize: | 3.18 MB |
This document is intended to be a record of the workshops and the comments made over the two evenings.
In addition this document will also provide an opportunity to keep those who attended the workshops and drop-in session over the two days informed and involved in the process we are undertaking.
Date added: | 12/11/2009 |
Filesize: | 1014.2 kB |
Isis recently held ‘Design for Change’ evening workshops to discuss Brentford’s waterside regeneration on 30 Sept and 1 Oct at Grounds Cafe. At this event, local people came up with 4 ‘design options’ for the area. These options have now been drawn up and will be the subject of discussion at our next community event on Thursday 26 November 6-9pm at the Holiday Inn, Brentford Lock
Date added: | 13/09/2009 |
Filesize: | 268.09 kB |
Date added: | 03/04/2009 |
Filesize: | 106.7 kB |
A private Consultant puts his views forward in a Conservation Report on the Commerce Road site for ISIS Waterside Regeneration, developers of the site.
Our own Waterside Consultant, Nigel Moore, tightens up on a bit of details within the report:
The comment re: historical usage / relation to the canal is, however, inaccurate. It has entirely overlooked the importance of the Fellows Morton Clayton Dock at the southern extremity of the Commerce Road area, apparently unaware that transhipment took place across the towpath via cranes all the way down, which photographic evidence attests to.
Date added: | 11/03/2009 |
Filesize: | 52.12 kB |
BCC and community stakeholder feedback for ISIS regeneration of Commerce Road
Date added: | 02/02/2008 |
Filesize: | 37.73 kB |
BCC407 - Response to planning submission regarding 1 Commerce Road.
Date added: | 19/12/2007 |
Filesize: | 59.34 kB |
BCC396 - This paper attempts to list the most important considerations which could affect the selection of the dominant land uses.